00   (intro)
 
01  
02  
03  
04  
(my prep work)
 
05  
06  
07  
(HVAC install and related)
 
08  
09  
(main retrofit days 1 - 2, substantial demolition)
 
10a  
10b  
11  
12  
13  
(main retrofit days 3 - 11, construction)
 
14  
15  
16  
17  
(main retrofit days 12 - 22, construction)
 
18  
19  
20  
(roofing)
 
21  
22  
23  
(post-contractor fixups, job wrapup, and some early performance data)
 
24  
25  
26  
27  
(deeper testing/observation scenarios, stats, and more small improvements)
Additional projects:
Other ongoing home-improvement activities, either related to
the retrofit or not
    
Roof ridge cap splices
    
Clips to hold down gutter guards instead of zip-screws
    
Motion-sensor light and doorbell hack
    
Deep drainage/infiltration pit in the front yard
    
Permeable pavers driveway rework (fairly major project)
    
Underground gutter, below-grade foundation water protection
    
Front door fix-ups, less ugliness and more thermal
performance
    
Snow clearing on the roof and related insights,
"endless winter" 2015
    
External foundation insulation, a layer of R-8
rockwool wrapped around most of the basement wall
    
Diagnosing a heat-pump failure due to a bum
thermistor, summer 2018
    
Chasing an annoying slow refrigerant leak in the
 Daikin   (multi-year saga, 2019 - ?)
    
Replacing the main inverter board in the Daikin outdoor
 unit, and figuring out why it died (spring 2021)
    
Finally documenting the basement radiant barrier
 installation, which I didn't capture a ton of detail about